Skip to main content

Projects

Karbala Hospital Project - Iraq

We are honored to have successfully supplied the generators for the Karbala 400-Bed Hospital Project, located in the city of Karbala, Iraq. The project included the delivery of three high-performance generators, each with a capacity of 2500 kVA, operating in a fully synchronized system. This setup ensures continuous and reliable power supply to meet the critical demands of the hospital's operations. Our contribution to this essential healthcare facility reflects our commitment to powering vital infrastructure with dependable and efficient energy solutions.

Hakeem Hospital Project - Iraq

As part of our ongoing efforts to support critical infrastructure projects across Iraq, we proudly supplied the generator systems for Al-Hakim Hospital in Najaf. The power solution for this facility includes three 1650 kVA generators and one 2250 kVA generator, all integrated into a fully synchronized system to ensure seamless and uninterrupted power delivery. This setup is designed to meet the hospital's high energy demands and provide maximum reliability for its vital medical services. Our involvement in this project highlights our expertise in delivering customized power solutions for the healthcare sector.

  

Dujail Hospital Project - Iraq

We had the opportunity to supply the complete power solution for Al-Dujail Hospital, located in the Dujail area of Iraq. The project scope included the provision of two 1100 kVA generators along with a fully equipped generator canopy. This setup was carefully designed to ensure durability, safety, and ease of maintenance, supporting the hospital’s daily operations with a stable and efficient power source. Our role in this project reflects our ability to deliver practical and reliable energy systems tailored to the specific needs of healthcare facilities.

Al-Amameen Al-Jawadin Hospital - Iraq 

as part of the Completion of Works for Al-Amameen Al-Jawadin Hospital (50-bed capacity) in Al-Sab' Al-Bour, located in Al-Taji, Iraq, we successfully delivered a comprehensive power generation package. The project included the supply of two 1100 kVA generators and one 1500 kVA generator, along with a fully equipped generator room. Designed to meet the hospital’s operational needs, the power system ensures dependable energy supply to support essential medical services. This project adds to our growing portfolio of healthcare infrastructure solutions across the region.

  

Samra Electric Power Co. (SEPCO) - Jordan

We successfully delivered and commissioned a 1500 kVA generator for Samra Electric Power Co. (SEPCO), covering the full scope of supply, installation, and startup operations. The project was executed with a focus on efficiency, safety, and reliability, ensuring the power system was fully integrated and ready for seamless operation. Our team handled all on-site works, from mechanical and electrical installation to final testing and commissioning, reflecting our commitment to delivering end-to-end power solutions tailored to our clients’ specific requirements.

Al-Ahliyya Amman University 

We are proud to announce the successful supply, installation, and commissioning of a new 1500 kVA (Kilovolt-Ampere) electric power generator at Al-Ahliyya Amman University (AAU). This vital project aims to guarantee continuous power supply and support the infrastructure, specifically for the Faculty of Dentistry.

The installation process was executed with high efficiency, encompassing site preparation, the precise installation of the generator and its auxiliaries, and the crucial execution of comprehensive commissioning tests. These steps ensure the system is ready to operate immediately and reliably during power outages. This new generator represents a powerful addition that guarantees the uninterrupted flow of educational processes, laboratory, and clinical services, thereby significantly enhancing the quality and efficiency of work within the Faculty.

  

Nahrawan Hospital Project

We are delighted to announce the successful completion of a critical power project at Nahrawan Hospital in Iraq. This landmark undertaking involved the supply of two massive electric generators with capacities of 1650 kVA and 2500 kVA.

The defining feature of this project is the advanced Synchronization technology employed, allowing both generators to operate together as one integrated system. This sophisticated setup ensures a stable, efficient, and reliable power supply, crucial for the uninterrupted operation of the hospital's life-saving equipment and facilities. By distributing the load evenly and maximizing operational efficiency, the system offers significant flexibility and redundancy. Every phase, from the initial supply to the final commissioning tests, was executed in accordance with the highest quality and safety standards, guaranteeing the hospital's power needs are met reliably and sustainably.